1. Operation Instruction of filter canister replacement:
(1) Turning filter canister clockwise to dismantle it from body.
(2) Turning fresh filter canister onto the body counter clockwise to mount it.
(3) Turning handle of diverter to position of filter water and let water run through for 30 secs at first use.
2. Material: composition of filter canister: calcium sulphide ball, China medical stone, energy ball, KDF.
1. Max working temperature: no more than 60℃.
2. Flow rate: 2.9 liters/ minute.
3. Estimated Function Duration: daily flowing rate of 60 liters for 8 months. (However this duration will be fluctuated depending on quality and pressure of local water).