GERERAL:
1.It must bend it on the second processing and to use the glue in it.
2.Pre-Production are complicated, time-consuming, material consumption and power consumption.
3.Transport costs are very high, the weight of good is too heavy and it waste of space.
4.Standard specifications are restricted. It is difficult to match for smooth surface and the cement .
5.Hardness, after thermal expansion and contraction ,it is easy to reveal cracks on the wall.
6.The Price is very expensive, it is not easy to repair and maintain.
7 Only one color is easy to mix up and make a mistake while it is in the process of construction.
The Innovation of YEA DER LIH ENTERPRISE CO.,LTD:
1.Subverting the traditional ways of working process.
2.The same floor can save about triple times than traditional ways.
3.No need to hire more staff, it is not easy to make a mistake on a construction site.
4.It will have a good binding ability for scraggy structure and the cement surface.
5.Softnesst , it can be accepted the pressure of thermal expansion and contraction.
6.It is not easy to cracks on the wall.
7.Providing the best heat dissipation within in the uneven structure of inside portion.
8.It is not easy to bring about the hot for the pipe line.
9.Flexibility design for claw portion of fitting. Good operation.
10.It is small and no occupy the space, we offer the special price to your esteemed company.
It is one of your best choice for PVC PIPE OF DISTRIBUTION ENGINEERING & PIPE PROJECT.
11. We provide it with 7 colors in order to distinguish from others while it is on the construction site.
There are three categories as below:
一、 PVC PIPE OF ELECTRICAL DISTRIBUTION
二、 BOX SOCKET OF ELECTRICAL DISTRIBUTION
三、PIPE ENGINEERING
It is customized.
The Innovation of YEA DER LIH ENTERPRISE CO.,LTD:
1.Subverting the traditional ways of working process.
2.The same floor can save about triple times than traditional ways.
3.No need to hire more staff, it is not easy to make a mistake on a construction site
4.It will have a good binding ability for scraggy structure and the cement surface.
5.Softnesst , it can be accepted the pressure of thermal expansion and contraction
6.It is not easy to cracks on the wall.
7.Providing the best heat dissipation within in the uneven structure of inside portion.
8.It is not easy to bring about the hot for the pipe line
9.Flexibility design for claw portion of fitting. good operation
10.It is small and no occupy the space, we offer the special price to your esteemed company
It is one of your best choice for PVC PIPE OF DISTRIBUTION ENGINEERING & PIPE PROJECT
11. We provide it with 7 colors in order to distinguish from others while it is on the
construction site.
1.Subverting the traditional ways of working process.
2.The same floor can save about triple times than traditional ways.
3.No need to hire more staff, it is not easy to make a mistake on a construction site
4.It will have a good binding ability for scraggy structure and the cement surface.
5.Softnesst , it can be accepted the pressure of thermal expansion and contraction
6.It is not easy to cracks on the wall.
7.Providing the best heat dissipation within in the uneven structure of inside